The Permits

Reading a ZIMAS report

A reader's slip on the ZIMAS parcel report: which lines state what a lot already is, its zoning, overlays and permits, and where the record stays quiet.

A computer screen showing a parcel profile with zoning codes and a printed lot report beside it.
She only wanted to know what the city knew before she signed anything. Photograph: Cornelia Ray Vann
Shelf
The Permits
Call number
PER-001
Filed
Reading
6 min

The folder arrived with an escrow number inked on its tab and a ZIMAS printout riding on top, corners gone soft from the kitchen table. The reader behind it is deep in the contingency period on a bungalow above a stair street: clinker brick across the porch skirt, a sleeping porch closed in off the back bedroom, a retaining wall stepping the yard down toward the public stairs. Her question, written on the slip that now sits in this drawer, was plain enough. Before she waives anything, she wants to know what the city already says the lot is, not what the listing claimed and not what the seller remembers. So we pulled the parcel report the city keeps on every lot in Los Angeles and read it the way it is laid out, top to bottom. What follows is that reading, line by line, with the stops marked.

Keeping a parcel file this way is not a Los Angeles habit only: the Quarterdeck Library shelves its nautical volumes by the same rule, catalogued, credited and pullable.

What the city calls the lot first

The report comes out of ZIMAS, the Zone Information and Map Access System, free to anyone at zimas.lacity.org and kept current by LA City Planning. The first page does the dull work, and the dull work is the part that makes every other document agree. Address first, then the legal description: the tract name, the block, the lot number as the original subdivision filed it. Then the Assessor's Identification Number, ten digits, the same number the county assessor's roll uses to tax the dirt. If the title company's papers and the city's papers describe the parcel differently, this is the page that settles which lot everyone is talking about. Lot dimensions and lot area follow, with the tract map references an engineer can pull later. It reads like a catalogue entry because it is one: what the lot is called, where it sits, and how big the record believes it to be.

Which line says what may be built?

Midway down comes the zoning line. It reads short, R1-1 or RD1.5-1 across much of these neighborhoods, sometimes with a height district hanging off the end, and it carries more weight than any other line in the report. It names the zone the lot sits in, and the zone points back to the municipal code, where setbacks, floor area and height are actually spelled out. ZIMAS states the zone; it does not translate it. Near it sits the general plan land use line, the city's longer horizon for the block. A buyer in escrow should copy the zoning line exactly, every hyphen and suffix included, and hand it to whoever advises her. The misreading we see most often at the desk is a buyer who sees an R2 and assumes the house can simply become two units; whether it can is answered in the code, and sometimes in a zoning verification letter, never in the map alone.

When a second map lies on top of the first

Below the zone come the overlays, and in this corner of Northeast Los Angeles one line outweighs the rest: the Highland Park-Garvanza HPOZ. If the parcel sits inside the preservation zone, the report says so in plain text, and that single line changes the paperwork around a porch post. Windows, siding, knee braces, a retaining wall facing the street, a fence along the front: work visible from the public way goes through preservation review before a permit issues, and those hearings leave minutes a neighbor can read. The hillside line matters nearly as much on a stair street lot, bringing its own rules for grading, walls and where a foundation may cut. ZIMAS lists these as layers because that is what they are, maps stacked on maps, and a single lot can wear two or three at once without any of them mentioning the others.

Do the permits match the house?

The report also gathers permit activity tied to the address, from what the Department of Building and Safety holds on file. This is the section to read standing in the yard rather than at the table. The sleeping porch off the back bedroom: is there a permit line for enclosing it, or does it stand outside the record entirely? The garage with a subpanel and a closet: converted on paper, or only in fact? A handful of lines on an older house is normal, and so are gaps. Some permits closed with a final inspection, some expired open, and the report does not always say which. What the section gives you is a shape: where the paper trail is thick, and where it thins to nothing. The thin places are the questions to ask inside the contingency period, while the asking still has leverage.

The slope, the wall and the stairs

On a hillside lot the report keeps talking after the flat-lot sections fall silent. The lot area line counts every square foot, including the part falling away behind the retaining wall, which is one reason two documents can disagree about the size of a yard. Easements surface here too. A stair street is public, but where the public stairs end and private dirt begins is exactly the kind of margin where the city's sheet and the assessor's roll diverge. This is where the preliminary title report earns its fee: the title company lists recorded easements by book and page, and those lines should be laid beside the ZIMAS sheet until the two agree. If a strip of the front yard carries a walkway easement so neighbors can reach the stairs, it will appear in one of these documents. It ought to appear in both.

Where the record stops

The ZIMAS report says what the lot is. It does not say what the house is worth, and it says nothing about condition. It will not tell her whether the clinker brick is original, whether the wall at the foot of the stairs is holding or leaning, or whether the closed-in porch was ever inspected. It is not a survey, not a title policy, and not a source for liens, which live with the recorder and the title company. It is a snapshot of zoning and planning facts, accurate as of the day it is printed and no longer. The gaps are not flaws in the document. They are questions the desk refers elsewhere: ownership and taxation to the assessor, encumbrances to the title report, the wall itself to whoever walks it with a level.

One slow evening, three lines read aloud

Her folder went back over the counter with the printout still on top. Any reader can do the same. Find the parcel on zimas.lacity.org and print the full report, then read three lines aloud, slowly: the zoning line, the overlay lines, the permit lines. Pull the tract map the first page cites and see the lot as the original subdividers drew it. When the preliminary title report arrives, mark its easements in the margin of the city's sheet and reconcile the two before the contingency clock runs out. Then walk the lot from the stair street to the back fence with the pages in hand. The city wrote down what it knows about the lot long before you asked; the reading is free, and it takes one slow evening.

Answered by Cornelia Ray Vann, keeper of the deskshelved by August Pell6 min2 works